Demand Responsive
Thermostatic Controls |
This
measure evaluates the feasibility of requiring programmable
thermostats in residential and nonresidential buildings that
can be easily
upgraded to have demand response capabilities. |
Controls and
Demand Response |
|
Demand Responsive Lighting
Controls |
This measure is developing
specifications to define lighting control systems with
adequate demand response capabilities and an acceptance test
to ensure DR equipment functions as designed. |
Lighting
topics |
|
Water Heater Standing
Loss |
This measure is developing
requirements that will reduce standby losses from natural
draft circulation up the flue in natural gas water heaters.
Mandatory requirement for
water heaters to be equipped with flue dampers or have force
draft design. |
Process Air
Compressors, Boilers, and Water Heaters |
|
Water Heating and Space
Heating |
This measure will improve
the ACM to reduce distribution heat loss by space heating and
domestic hot water systems. |
Nonresidential
HVAC |
|
PIER Study Acceptance
Testing |
Project will take the results
of a PIER project investigating acceptance testing
requirements, propose strategies to simplify tests or
testing procedures, and/or propose new tests as appropriate,
and support the recommendations through the CEC rulemaking
process. |
Acceptance Testing and Design-phase Commissioning |
|
Commissioning/RCx
Acceptance Tests |
Propose new acceptance tests
from experience with retro commissioning or commissioning
programs that have identified common failure modes that can
be identified with a short directed acceptance test. |
Acceptance Testing and Design-phase Commissioning |
|
VAV labs and fume exhaust |
VAV control for labs.
Includes measures to control the pressurization of rooms and
variable fume exhaust. |
ASHRAE 90.1-related topics and Cooling Towers |
|
Chiller eff and Chiller k
Factor Equation |
Significantly improved chiller
efficiencies / part load performance for chillers. Also K
factor: This increases the coverage of chillers by 52% more
than the existing tables and 10% over 90.1-2007 Addendum M |
ASHRAE 90.1-related topics and Cooling Towers |
|
Heat recovery for high ACH |
Require heat recovery for
heating and cooling systems with high ventilation rates. |
Nonresidential
HVAC |
|
Kitchen vent |
Commercial kitchen ventilation
controls |
ASHRAE 90.1-related topics and Cooling Towers |
|
Small ECM motors |
Require ECM for non-fractional
hp motors - and all motors that are not part of NAECA
covered equipment (including exhaust fans and parallel VAV
boxes). |
ASHRAE 90.1-related topics and Cooling Towers |
|
Garage CO DCV |
DCV for garage ventilation -
O2 sensors. Includes aged/accuracy sensor testing in local
garages |
ASHRAE 90.1-related topics and Cooling Towers |
|
Plug Load Controls |
Methods of reducing stand-by
loads with centralized controls for turning off banks of
circuits during unoccupied hours. Parallel circuits for
controllable and non-controllable plug loads. |
Controls and
Demand Response |
|
PV ready buildings |
Require non-residential
buildings to be PV Ready by requiring pre-piping conduit
between service panel and roof, and/or requiring a minimum %
of roof space be left free for PV, and/or other structural
or rooftop configuration measures. |
Solar Topics |
|
Cooling towers |
Investigate appropriate W/Btu
of heat rejection appropriate for longer hours associated
with process cooling, VSD control of fans. Add closed
circuit fluid coolers to table 112-G. Provide prescriptive
minimum approach based on minimum efficiency, hours of use
and climate. |
ASHRAE 90.1-related topics and Cooling Towers |
|
Air compressors |
Develop requirements for
industrial plants with compressed air systems to implement
system control mechanisms on multi-compressor systems. |
Process Air Compressors, Boilers, and Water Heaters |
|
Boilers |
This measure will investigate
draft damper or forced draft, parallel positioning and O2
trim control, and VFD for large boilers |
Process Air Compressors, Boilers, and Water Heaters |
|
Solar water heating |
Increase the prescriptive
requirement for residential solar water heating when
electric resistance water heating is used, and implement
requirement for commercial building types where electric
water heat is used. Introduce an hourly solar thermal model
for solar water heating. |
Solar Topics |
|
Boiler temperature reset
controls |
Remove the current chilled and
hot water temperature reset controls exception in section
144J to apply only to hot water systems with VSDs, rather
than all hydronic systems with variable flow |
Process Air Compressors, Boilers, and Water Heaters |
|
Cooling Tower Water Savings |
Increase cycles of
concentration/ decrease blow down in cooling towers. |
ASHRAE 90.1-related topics and Cooling Towers |